I have said it before and I'll say it again -- the slow reveal is verrry sexy:
Which is why it mystifies me that so many porn films cut from a quick, fully-clothed meeting to vigorous naked arse-pumping, with no seductive undressing in between.
The lovely model in this sequence is doing it right.
You don't want to give too much away too soon.
And this boy has a lot to give.
When the excited tumescence is finally revealed in all its glory, we are thrilled and excited too.
We are ready to share his wondrous goodies, the treasures he has so carefully unwrapped for our viewing pleasure.
You don't think I'm reading too much into this, do you?
Trains, films, architecture, my photography, and interminable pictures of small winkies. A veritable snack.
Friday, 26 November 2010
Back on track
Ok, let me try again to bring you the exciting news from yesterday's "big announcement" about UK railway capital investment.
First up, Thameslink 2000 (the £6bn north-south cross-London railway line, which has been undergoing massive upgrade works to increase its capacity from four trains an hour to 24) will be delivered in its entirety -- though slipped two years to 2018. The original project name shows it's already slipped by nearly two decades, so I guess a couple of years more won't hurt.
As predicted, a solution has been found to what seemed to be severe problems with the remodelling of London Bridge (London's first railway terminus, and now a hugely busy junction for almost every train arriving from the south-east and many from the south).
Thameslink will also get a fleet of brand-new trains, consisting of "up to" 1,200 carriages which will be joined into units of four: these will usually operate as 8- or 12-car trains.
The brand-new fleet of trains for the £15bn Crossrail project was also confirmed, totalling 600 new carriages.
There was confirmation of the major station reconstructions and revamps at Reading (at a cost of £850m -- yes, you read that right)...
... Birmingham (£600m), Gatwick Airport (though that's a relatively modest scheme at £53m) and London King's Cross (£500m, though since the latter is already underway and about half-built, it's difficult to see how that could have been stopped). This is Birmingham:
There was also an "announcement" of unspecified "investments" on "the East Coast Main Line and Midland Main Line, and improvements in Yorkshire, on trans-Pennine routes, around Manchester, and in South Wales". I'm hoping the ECML includes the grade separated crossing to be constructed on a flyover at Hitchin, to end conflicting movements between northbound London-Cambridge trains and the southbound ECML: we'll find out in the New Year.
Further electrification of the MML is still, apparently, not entirely ruled out (and if you ignored the urgency of the need to replace the venerable diesel-powered High Speed Trains, the business case for electrifying the MML was substantially stronger than the GWML -- though, in truth, both should be electrified already, along with most of the rest of the network). This is Liverpool South Parkway, a station belying a recent grumpy comment on this blog that "The North" doesn't get any new station buildings:
A £300m electrification scheme in north-west England goes ahead, connecting Liverpool and Manchester, and Preston and Blackpool (a key project to enable the conversion of Manchester-Scotland trains from all-diesel to all-electric). New Anglo-Scottish trains will also be provided (rather than refurbished cast-offs from the current Thameslink fleet, which was the original plan).
And commuter electrification of GWML goes ahead -- from Heathrow Airport Junction, outside London's Paddington, to Oxford, Didcot and Newbury (the latter in turn makes it almost certain that the western terminus of Crossrail will be Reading, which it should have been all along, rather than Maidenhead). The current trains used on Thameslink will be refurbished and cascaded to these newly electrified commuter services.
This GWML electrification is scheduled to be completed in 2016 and, with any luck, the team can then simply roll-on to electrification of the remainder of the same route.
The other consequence of this decision is that large numbers of relatively modern diesel multiple units can be taken off this route and cascaded to other parts of the country, to replace incredibly elderly and frankly miserable equipment such as the evil Pacers and some of the more spartan Sprinters. That can't happen soon enough.
But -- decisions on the electrification of the remainder of the GWML (London-Bristol-South Wales) and on the replacement for InterCity 125 high speed trains were delayed until "early" in the New Year.
The Hitachi Super Express Train (oo-er, Missus), is still in contention even following the devastating Foster report, earlier this year. The government has "ruled out the option of requiring passengers to interchange from electric to diesel trains, recognising the value to passengers of preserving through-journeys", as well as ruling out "the option of a wholesale refurbishment of the existing diesel InterCity 125 fleet, some of which dates back to the 1970s".
The options left are, firstly, a simpler and lower-cost Hitachi proposal: some all-electric trains, and some electric trains which are also equipped with underfloor diesel engines (giving the worst of all worlds); or, secondly, a fleet of new all-electric trains which could be coupled to new diesel locomotives where the overhead electric power lines end. The Foster Report referred to the Class 444s currently operated by SouthWest Trains as an example of a suitable long-haul express electric train:
Government argues that both options would allow through-journeys between London and parts of the rail network which are not electrified, and both would deliver faster journey times: "for example, we expect to see a time saving of at least 15 minutes for the journey between Cardiff and London bringing it below 2 hours".
Given the praise doled out to Hitachi by DfT at the time of the Foster report, and the particular praise for the financial structure, I suspect that, even though it's the crummiest solution in terms of passenger comfort, we'll be riding Super Express Trains within the decade, the diesel engines under the floor vibrating away, the low ceilings cramming us into airless, tube-style spaces. Super.
The announcement which gathered all the headlines was for "2,100 additional carriages on the rail network", although once you deduct the Thameslink and Crossrail fleets that adds up to just 300 new carriages (or roughly 50-70 new trains), sometime before the end of the coming decade, with a similar number over the eight subsequent years. This is far fewer than the 1,300 new carriages promised by NuLab, although that turned out to consist in large measure of lies and mirrors rather than actual, real trains. It's not a huge number, but with Crossrail, Thameslink and the 1,800 new InterCity carriages it represents a really startling number of new trains.
The railways are, so far, doing much better under this administration than I had feared. This £8bn (US$12.5bn, €9.5bn) of capital works is on top of the £14bn allowed for Network Rail over the next four years, and £0.75bn for the first stages of planning the new north-south High Speed Rail.
First up, Thameslink 2000 (the £6bn north-south cross-London railway line, which has been undergoing massive upgrade works to increase its capacity from four trains an hour to 24) will be delivered in its entirety -- though slipped two years to 2018. The original project name shows it's already slipped by nearly two decades, so I guess a couple of years more won't hurt.
As predicted, a solution has been found to what seemed to be severe problems with the remodelling of London Bridge (London's first railway terminus, and now a hugely busy junction for almost every train arriving from the south-east and many from the south).
Thameslink will also get a fleet of brand-new trains, consisting of "up to" 1,200 carriages which will be joined into units of four: these will usually operate as 8- or 12-car trains.
The brand-new fleet of trains for the £15bn Crossrail project was also confirmed, totalling 600 new carriages.
There was confirmation of the major station reconstructions and revamps at Reading (at a cost of £850m -- yes, you read that right)...
... Birmingham (£600m), Gatwick Airport (though that's a relatively modest scheme at £53m) and London King's Cross (£500m, though since the latter is already underway and about half-built, it's difficult to see how that could have been stopped). This is Birmingham:
There was also an "announcement" of unspecified "investments" on "the East Coast Main Line and Midland Main Line, and improvements in Yorkshire, on trans-Pennine routes, around Manchester, and in South Wales". I'm hoping the ECML includes the grade separated crossing to be constructed on a flyover at Hitchin, to end conflicting movements between northbound London-Cambridge trains and the southbound ECML: we'll find out in the New Year.
Further electrification of the MML is still, apparently, not entirely ruled out (and if you ignored the urgency of the need to replace the venerable diesel-powered High Speed Trains, the business case for electrifying the MML was substantially stronger than the GWML -- though, in truth, both should be electrified already, along with most of the rest of the network). This is Liverpool South Parkway, a station belying a recent grumpy comment on this blog that "The North" doesn't get any new station buildings:
A £300m electrification scheme in north-west England goes ahead, connecting Liverpool and Manchester, and Preston and Blackpool (a key project to enable the conversion of Manchester-Scotland trains from all-diesel to all-electric). New Anglo-Scottish trains will also be provided (rather than refurbished cast-offs from the current Thameslink fleet, which was the original plan).
And commuter electrification of GWML goes ahead -- from Heathrow Airport Junction, outside London's Paddington, to Oxford, Didcot and Newbury (the latter in turn makes it almost certain that the western terminus of Crossrail will be Reading, which it should have been all along, rather than Maidenhead). The current trains used on Thameslink will be refurbished and cascaded to these newly electrified commuter services.
This GWML electrification is scheduled to be completed in 2016 and, with any luck, the team can then simply roll-on to electrification of the remainder of the same route.
The other consequence of this decision is that large numbers of relatively modern diesel multiple units can be taken off this route and cascaded to other parts of the country, to replace incredibly elderly and frankly miserable equipment such as the evil Pacers and some of the more spartan Sprinters. That can't happen soon enough.
But -- decisions on the electrification of the remainder of the GWML (London-Bristol-South Wales) and on the replacement for InterCity 125 high speed trains were delayed until "early" in the New Year.
The Hitachi Super Express Train (oo-er, Missus), is still in contention even following the devastating Foster report, earlier this year. The government has "ruled out the option of requiring passengers to interchange from electric to diesel trains, recognising the value to passengers of preserving through-journeys", as well as ruling out "the option of a wholesale refurbishment of the existing diesel InterCity 125 fleet, some of which dates back to the 1970s".
The options left are, firstly, a simpler and lower-cost Hitachi proposal: some all-electric trains, and some electric trains which are also equipped with underfloor diesel engines (giving the worst of all worlds); or, secondly, a fleet of new all-electric trains which could be coupled to new diesel locomotives where the overhead electric power lines end. The Foster Report referred to the Class 444s currently operated by SouthWest Trains as an example of a suitable long-haul express electric train:
Government argues that both options would allow through-journeys between London and parts of the rail network which are not electrified, and both would deliver faster journey times: "for example, we expect to see a time saving of at least 15 minutes for the journey between Cardiff and London bringing it below 2 hours".
Given the praise doled out to Hitachi by DfT at the time of the Foster report, and the particular praise for the financial structure, I suspect that, even though it's the crummiest solution in terms of passenger comfort, we'll be riding Super Express Trains within the decade, the diesel engines under the floor vibrating away, the low ceilings cramming us into airless, tube-style spaces. Super.
The announcement which gathered all the headlines was for "2,100 additional carriages on the rail network", although once you deduct the Thameslink and Crossrail fleets that adds up to just 300 new carriages (or roughly 50-70 new trains), sometime before the end of the coming decade, with a similar number over the eight subsequent years. This is far fewer than the 1,300 new carriages promised by NuLab, although that turned out to consist in large measure of lies and mirrors rather than actual, real trains. It's not a huge number, but with Crossrail, Thameslink and the 1,800 new InterCity carriages it represents a really startling number of new trains.
The railways are, so far, doing much better under this administration than I had feared. This £8bn (US$12.5bn, €9.5bn) of capital works is on top of the £14bn allowed for Network Rail over the next four years, and £0.75bn for the first stages of planning the new north-south High Speed Rail.
Thursday, 25 November 2010
Besotion
For me, this chap doesn't really have to try at all.
He could just be sitting around in his pants, hair awry, and I wouldn't care.
I could look on him with seedy benevolence all day.
Though, truth be told, I'd probably have to take action at some point, probably sooner rather than later.
I mean, he is irresistible, right?
I am besotted. And I don't care who knows it.
He could just be sitting around in his pants, hair awry, and I wouldn't care.
I could look on him with seedy benevolence all day.
Though, truth be told, I'd probably have to take action at some point, probably sooner rather than later.
I mean, he is irresistible, right?
I am besotted. And I don't care who knows it.
Buggeration
That's utterly infuriating. I've just spent half an hour writing an incisive and comprehensive overview of the railway capital investment programme announced today by the government, and Blogger has just eaten it all.
I'd found about twenty really cute new images, too, and labouriously uploaded them, one by one, on what tonight must be the world's slowest broadband connection (more like narrowband, actually): they were all "disappeared" by Blogger, too.
Everything went wrong when I formatted some paragraphs with bullet points.
That'll teach me to try to be clever.
And now I haven't the heart or energy to start again. Sorry. You're going to have to look elsewhere for that news. Still, at least that means it'll be accurate.
I'd found about twenty really cute new images, too, and labouriously uploaded them, one by one, on what tonight must be the world's slowest broadband connection (more like narrowband, actually): they were all "disappeared" by Blogger, too.
Everything went wrong when I formatted some paragraphs with bullet points.
That'll teach me to try to be clever.
And now I haven't the heart or energy to start again. Sorry. You're going to have to look elsewhere for that news. Still, at least that means it'll be accurate.
Wednesday, 24 November 2010
Vroom-vroom
I was thrilled to discover this photoseries.
Not that I have any great enthusiasm for effeminate twinky blonds, but I do have a faint whiff of desire for motorcycle studs.
No, silly, not those ZZ-Top-types, but hot young dudes in leathers.
So imagine my joy and delight in finding a sequence such as this, with high-res images, too.
And this last image was my favourite -- very hot.
Which just about makes up for the fact that I seem to have screwed-up the download of two other images in this series.
Ah well -- use your imaginations.
Not that I have any great enthusiasm for effeminate twinky blonds, but I do have a faint whiff of desire for motorcycle studs.
No, silly, not those ZZ-Top-types, but hot young dudes in leathers.
So imagine my joy and delight in finding a sequence such as this, with high-res images, too.
And this last image was my favourite -- very hot.
Which just about makes up for the fact that I seem to have screwed-up the download of two other images in this series.
Ah well -- use your imaginations.
Ay, Coruna!
Tonight's the night for single-image posts. But annoying though I'm sure it is, I saw an image of this lovely man and I had to share.
That chest, the hair, those muscles and that teeny winkie.
Who will tell me that I did a wrong thing, eh?
That chest, the hair, those muscles and that teeny winkie.
Who will tell me that I did a wrong thing, eh?
Handy
I wish that was my hand, resting flat on his belly.
That's all I have to say about this photograph.
Yes, I think that says it all.
That's all I have to say about this photograph.
Yes, I think that says it all.
Snailiform fun
The architect's model for the new booking hall and footbridge at Newport Station in South Wales looked intriguing:
The reality has turned out to be just as good.
Using very durable materials (including the fabric from the Eden Centre), the architects have devised a rather space-age form:
There have been some mutterings about replacing a Victorian footbridge (albeit a rather, er, pedestrian one, and one which was too small and inaccessible) with this.
I think those people are wrong. This architecture may not be fashionable for long, but as an engineering solution I think this has a lot of class -- and, hence, I suspect it will have a long life.
I'm not generally wild about whimsy in public architecture -- I prefer the values to be more about solidity and openness.
But the playfulness at Newport does not feel out of place. In fact, it feels delightful.
I rather wish this was my local station (or, rather, I mean I wish this was in London: I certainly wouldn't want this to be my local station if the price I had to pay was residency in Newport).
The reality has turned out to be just as good.
Using very durable materials (including the fabric from the Eden Centre), the architects have devised a rather space-age form:
There have been some mutterings about replacing a Victorian footbridge (albeit a rather, er, pedestrian one, and one which was too small and inaccessible) with this.
I think those people are wrong. This architecture may not be fashionable for long, but as an engineering solution I think this has a lot of class -- and, hence, I suspect it will have a long life.
I'm not generally wild about whimsy in public architecture -- I prefer the values to be more about solidity and openness.
But the playfulness at Newport does not feel out of place. In fact, it feels delightful.
I rather wish this was my local station (or, rather, I mean I wish this was in London: I certainly wouldn't want this to be my local station if the price I had to pay was residency in Newport).
Tuesday, 23 November 2010
Those naked rowers
It's naked sportsman calendar time, and a bunch of Warwick University rowers has stripped off to raise cash for their sport.
They appear to be mighty fine-looking chaps, all muscley, er, muscles and manly body hair. Very taut. Very pingy (that's a technical term).
Anyway, you can support this noble venture by buying the calendar or very high-res digital downloads (including, if you're very cheap, of just the one single image you can't live without. Think of it as an iTunes for hot totty images, where you don't have to buy the full album. But then remember it's for charidee, students helping themselves, etc, and feel good about giving them your money).
My sources tell me the printed calendar itself costs £7 + P&P (oh, alright, Goddamnit, £6.99. Is anyone taken in by that pricing point crap anymore?), or you can get a digital download job for £3.99, individual images for 99p. All from here: www.uwbc.org.uk
Can I just say I've reserved the chap 2nd from left in that shot, above. And his mate at extreme right. Oh, and the chap in the first photo of this post, on the extreme left, who is having none of that appalling manscaping business...
My thanks to the highly skilled photographer Angus Malcolm at www.barnsburystudio.com. I have no idea how he managed to concentrate enough to avoid camera shake.
They appear to be mighty fine-looking chaps, all muscley, er, muscles and manly body hair. Very taut. Very pingy (that's a technical term).
Anyway, you can support this noble venture by buying the calendar or very high-res digital downloads (including, if you're very cheap, of just the one single image you can't live without. Think of it as an iTunes for hot totty images, where you don't have to buy the full album. But then remember it's for charidee, students helping themselves, etc, and feel good about giving them your money).
My sources tell me the printed calendar itself costs £7 + P&P (oh, alright, Goddamnit, £6.99. Is anyone taken in by that pricing point crap anymore?), or you can get a digital download job for £3.99, individual images for 99p. All from here: www.uwbc.org.uk
Can I just say I've reserved the chap 2nd from left in that shot, above. And his mate at extreme right. Oh, and the chap in the first photo of this post, on the extreme left, who is having none of that appalling manscaping business...
My thanks to the highly skilled photographer Angus Malcolm at www.barnsburystudio.com. I have no idea how he managed to concentrate enough to avoid camera shake.
I was wrong
You know how I said this was the winner of my time-unlimited competition for the best body-painted costume at a WNBR event or similar?
And how it was such a shock and all, this being a blog that obsesses about winkies while the winner clearly was not in possession of such a thing?
Well, I was wrong.
It turns out there was another costumer which was more worthy of this immensely prestigious award.
Can I give you -- Smiley Face Man:
The audacity of the concept, the artistry with which it has been executed, the beatific Mona Lisa-esque almost-smile playing delicately about his mouth. And, of course, the breathtakingly wonderful winkie.
Yes, I think we have a clear winner now.
And how it was such a shock and all, this being a blog that obsesses about winkies while the winner clearly was not in possession of such a thing?
Well, I was wrong.
It turns out there was another costumer which was more worthy of this immensely prestigious award.
Can I give you -- Smiley Face Man:
The audacity of the concept, the artistry with which it has been executed, the beatific Mona Lisa-esque almost-smile playing delicately about his mouth. And, of course, the breathtakingly wonderful winkie.
Yes, I think we have a clear winner now.
Subscribe to:
Posts (Atom)




















































